
Petronor improves its energy efficiency with the installation of a Preflash tower
Petronor's new Preflash tower in Muskiz optimizes the distillation process, reducing energy consumption and CO2 emissions.
Petronor's new Preflash tower in Muskiz optimizes the distillation process, reducing energy consumption and CO2 emissions.
Petrobras advances its pre-salt exploration in the Campos Basin with the discovery of hydrocarbons in Brava Norte.
Following intensive cleanup and restoration work, the control and pumping system will be gradually resumed in the coming days.
The FPSO will feature a next-generation hull to meet its 25-year design life.
This new well will be transported to the Danube refinery in Százhalombatta, representing 1% of the oil company's total hydrocarbon production.
The project aims to produce up to 120,000 barrels of oil per day.
Key technical oversight to ensure the safety and efficiency of the Whiptail development in Guyana.
Petrobras identifies hydrocarbons in the Aram block in the Santos Basin, strengthening its presence in pre-salt exploration.
The arrival of American Energy reflects Crowley's commitment to developing new technological solutions in the energy sector.
Equinor activates production at Halten East, securing more gas for Europe in a high-demand market.
Oil production will quadruple thanks to the Jotun FPSO, adding approximately 80,000 barrels of oil equivalent per day (kboe/d).
PEMEX and authorities are expected to provide more information about the incident in the coming days.