
Zelestra begins construction of the “Jasper County Solar” photovoltaic plant in Indiana
The plant will have a capacity of 60 MWac, enough to power approximately 11,000 homes per year.

The plant will have a capacity of 60 MWac, enough to power approximately 11,000 homes per year.

The plant will be located at the Port of South Louisiana's Globalplex multimodal facility, with first-phase commercial operations scheduled to begin in 2028.

The new floating turbine designs have an operating capacity of 105 MW.

This platform joins Baker Hughes' digital solutions, such as JewelSuite and Leucipa, extending the industrial and energy value chains.

Efficient and sustainable lithium extraction also serves the interests of SLB and its commercial allies.

The "Wind Challenger" will use 49-meter telescopic sails.

The solar project will reduce 41,583 tons of CO2 emissions over the next 25 years.

The 41 turbines at the Vesterhav wind farms generate power for 350,000 households.

Calypso will make its debut by installing cables in the Sofia wind farm, one of the largest in the world, capable of supplying 1.2 million homes.

The Red Sea Project will be the world's first green city to be 100 percent powered by photovoltaics and energy storage.

M4 is a pioneering open source project, allowing data to be shared with scientists around the world in real time.

The station generates enough energy to travel up to 1,000 kilometers in an electric vehicle on a single charge.