
Assembly of the first floating wind turbine of the EFGL project starts in Port-la-Nouvelle
Once the assembly of the three wind turbines has been completed, they are expected to be transferred to the sea during the month of June.

Once the assembly of the three wind turbines has been completed, they are expected to be transferred to the sea during the month of June.

A single annual load of this plant is only enough for a one-way trip between Europe and Asia for a large ship.

The six projects will supply the equivalent annual electricity demand of 150,000 Spanish households and avoid the emission of 84,596 tons of CO₂ per year.

The northern Gulf of America region has the largest confirmed capacity in the U.S. for safe and permanent subway storage of CO2.

CompassH2 integrates efficient electrolysis technology with EPC management for industrial green hydrogen projects from 100 MW.

The total value of the contract amounts to 1,820,600 euros and lays the foundation for future expansion in a market with high growth potential.

The company currently operates 13 wind farms and six solar farms. Szprotawa will bring the total number of photovoltaic plants in operation to eight.

Kintore's BESS system will be able to store enough energy to power more than 300,000 homes for one hour.

The hydrogen generated will reduce the refinery's Scope 1 emissions, aligning with the UK's plans to move towards a low-carbon economy.

The company contributes to meeting New York's energy goals, with a total fleet exceeding 11 million MWh of clean production since 2016, strengthening the national energy…

With this initiative, the companies strengthen their commitment to a cleaner, more efficient energy system that is aligned with current climate requirements.

The new turbine variants are part of the modular EnVentus platform, designed to maximize energy production in low to medium wind zones.