
Jera Pledges 20 GW of Green Energy for Japan by 2035
It aims to strengthen the efficiency and sustainability of JERA, Japan's largest power generation company.
It aims to strengthen the efficiency and sustainability of JERA, Japan's largest power generation company.
BESS Tocopilla will have the capacity to generate 211 GWh annually, which can supply almost 90,000 Chilean homes.
Job creation is anticipated in both the construction and operational phases.
Up to 10% of the adsorbed gas may remain confined.
The clean energy produced by the solar farm will be able to supply around 200,000 homes.
The Kashiwazaki Kariwa plant has a generating capacity of 8.2 GW.
A Globe fuel cell powertrain, using compressed hydrogen supplied and making it even more efficient.
Through Plug Power's electrolyzers, MOL aims to partially replace the use of natural gas at its Danube refinery.
The feasibility study revealed that there are at least 77 sites in the United States suitable for the implementation of this technology.
This project was notable for its focus on not negatively altering the water quality and levels of Lake Burragorang.
The start-up and movement of 105 type C80 railcars was recorded.
The Baltica 1 project will have a capacity of 900 MW and will be located 80 km off the Polish coast.