First Turbine Spins at Germany’s Borkum Riffgrund 3 Wind Farm

The first turbine has been successfully installed at the German offshore wind farm Borkum Riffgrund 3. This wind farm, with an installed capacity of 913 MW, will become the largest offshore wind farm in Germany once it is operational. In addition, Borkum Riffgrund 3 globally by being the first offshore wind farm awarded without the <a href="https://inspenetdesarrollo.com/en/first-german-turbine-borkum-riffgrund-3/" class="more-link">...<span class="screen-reader-text"> First Turbine Spins at Germany’s Borkum Riffgrund 3 Wind Farm</span></a>