PV DRILLING IX platform begins its transfer back to Vietnam
The unit completed its technical reactivation in Europe and begins the journey to join drilling in Vietnam.
The unit completed its technical reactivation in Europe and begins the journey to join drilling in Vietnam.
OMV Austria achieves its first find in Block 106/4, with initial production in excess of 4,200 barrels per day.
It inspected 68 cables in three days with an accuracy of 92.37 %, reducing risks and maintenance times.
The system allows real-time monitoring of freshwater quality with high precision, thanks to a network of autonomous stations and intelligent sensors.
Wärtsilä will build a biogas plant for Bigadan in Horsens, with amine technology and a capacity of 6000 Nm³/h. It will start operation in 2026.
The new solution enables real-time defect detection during plastic injection molding.
The collision was caused by strong waves from Typhoon Tino, leaving no casualties or environmental damage.
A global alliance drives real solutions for the decarbonization and digitization of shipping.
Chile reinforces mining training with a new online educational offer with no quota restrictions.
They reduced 1,709 tons of CO₂ in three developments thanks to the use of materials with a lower carbon footprint.
The plant is part of the Bahrain industrial project, which aims for zero net emissions.
Seadrill's platform has been recognized for its performance, sustainability and safety in collaboration with ConocoPhillips.