Zenobē acquires 400 MW BESS system in northern England.
The system will be connected in 2028 and is part of the UK's plan to reach 25 GW of installed energy storage capacity.
I am a civil engineer and I work in the writing area. I have a deep passion for civil works. I constantly seek to update myself on new engineering technologies to integrate them into my work, since my main interest is exploring how innovations in the industrial sector can improve and transform the world.
The system will be connected in 2028 and is part of the UK's plan to reach 25 GW of installed energy storage capacity.
The Trapananda operates with 3,616 kWh of batteries and allows a reduction of up to 90% in emissions compared to diesel tugs.
Amazon will deploy up to 5 GW of nuclear power with Xe-100 reactors to meet AI demand in data centers.
The recent successful deployment of the ROV explorer Haiqin in the South China Sea marks a significant technical step forward for underwater underwater research in Asia. Designed by…
Te Rahui will generate enough energy to power 100,000 homes, strengthening New Zealand's renewable electricity grid.
Aurora Botnia will reach 12.6 MWh and will be the RoPax ferry with the largest battery capacity in the world.
The first section of rail made of CO₂-free steel is already installed and in operation at Linz Central Station.
SmartestEnergy will acquire 100% of the wind energy from the Lempster and Groton wind farms.
Serica has averaged 20,000 net barrels per day from wells connected to the Triton FPSO and plans to increase that figure with new wells.
Every year 140 million tons of carbon are lost in aboveground biomass due to the replacement of mature forests by young forests.
The LM26 reactor has already achieved its first plasma and first compression in 2025.
First BESS approved under the HRE Act in South Australia with environmental validation.