SLB Capturi and CO280 validate carbon capture in U.S. paper industry
The operational validation of the MTU represents a key step towards the adoption of effective direct biogenic emissions capture solutions in existing industrial environments.
The operational validation of the MTU represents a key step towards the adoption of effective direct biogenic emissions capture solutions in existing industrial environments.
Petróleos Mexicanos (Pemex) and the Colegio Nacional de Educación Profesional Técnica (Conalep) signed an agreement that will set the tone for a new stage of specialized training in…
The gas distributor Nedgia(Naturgy Group) and the bank BBVA have signed a strategic agreement that will allow thousands of homeowners' communities to modernize their diesel or coal boilers…
The construction of the ITER nuclear fusion reactor reached a new milestone with the integration of the fifth of the six modules that make up the central solenoid,…
In the private port of Hereke, Turkey, Nuh Çimento has started operations of a Liebherr LPS 420 electric crane, consolidating its modernization strategy to meet the energy and…
Maersk has officially opened its new logistics center in the Lin-gang area of Shanghai, consolidating its commitment to an integrated service network in the Asia-Pacific region. This new…
Tata Steel Nederland has taken a firm step towards the decarbonization of its industrial activity with the acquisition of the Vattenfall power plants located in the IJmond region…
This design allows sheep grazing or crop harvesting under the photovoltaic panels.
This project is part of an expanding portfolio that includes wind, solar and storage initiatives with a total potential capacity of 4,000 MW. With the Zerbst plant, Statkraft reinforces its role as a key player in the sustainable electrification of Europe.
The reactor vessel is placed in its final location within Unit 1.
The state-owned oil company plans to continue at this pace in the coming years to meet the established schedule.
The main function of the CLV is to install high voltage cables connecting offshore wind farms and interconnection systems to regional power grids.