Helix Robotics Solutions awarded contract for UXO research on UK’s largest subsea project
The project is the longest high voltage direct current (HVDC) submarine cable ever built in the UK.
Industrial engineer, entrepreneur and copywriter with several years of experience in the digital world. A fan of reading and creative writing. Isbel has always been fascinated by topics related to the ocean and the mysteries of the universe. She has been part of the Inspenet team as a news editor since 2023.
The project is the longest high voltage direct current (HVDC) submarine cable ever built in the UK.
The new catalyst increases the conductivity of the material tenfold, which improves the rate of the oxygen evolution reaction (OER).
Construction of the ninth home in the demonstration program is expected to begin in the coming days.
The facility will prevent the emission of 333,000 tonnes of CO2 annually.
The process to produce hydrogen requires only one-fifth of the electricity used in conventional electrolysis and also captures carbon as a solid byproduct.
The vehicle was so heavy that it required adjustments to reduce its weight and improve its flight performance.
The project will generate enough energy to power more than 28,000 homes.
After the wells were drilled, oil production increased by 26%.
The plants involved are located in Indonesia, the United Arab Emirates, China and Qatar.
The N1 brain implant would allow severely paralyzed people to control an assistive robotic arm using only their thoughts.
The robot's hydraulic legs ensure stability on sloping terrain, making it ideal for agriculture and construction.
The humanoid can perform up to 1,000 placement tasks per day with millimeter precision.