RECORD: Longest wind turbine blade loaded in China
The technology adopted for the process allowed real-time monitoring of the blades.
Industrial engineer, entrepreneur and copywriter with several years of experience in the digital world. A fan of reading and creative writing. Isbel has always been fascinated by topics related to the ocean and the mysteries of the universe. She has been part of the Inspenet team as a news editor since 2023.
The technology adopted for the process allowed real-time monitoring of the blades.
Following the renovation, the FPSO will continue operating for another 15 years, guaranteeing the production of 70,000 barrels of oil per day.
The event will bring together experts in corrosion protection and coatings.
This is the largest wind farm in Chile and the second largest in Latin America.
This initiative is part of a joint effort between several organizations, including Gasum and LOGENT PORTS & TERMINALS AB.
Sandvik achieved this feat without needing to replace any cutters, representing a 69% increase in performance.
The start of construction coincides with the 80th anniversary of the nuclear industry.
The project aims to produce up to 120,000 barrels of oil per day.
The first integrated ROV system under this new collaboration is already under development.
The team used Boston Dynamics' Spot robot, designed to perform remote inspections and cleaning work in hazardous environments.
The company will use a vessel with a foot access system, specialized divers, and an ROV equipped with high-precision tools.
Its advanced control algorithms allow the robot to plan complex whole-body movements taking into account the environment.