Does anybody include within their API 653 inspection protocol to perform a diesel test (or alternative penetrating oil), vacuum box testing of weld seems, or MFL scanning of floating roofs? If so, always, sometimes, or it depends? Thank You.
Floating Roof Reliability
Viewing 0 reply threads
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.